Planning & Design
·
·
- Master, Site and Campus Planning
- Program of User Requirements
- Existing Systems – Use and Integration
- Phasing, Scheduling, & Discipline Coordination
- Design/Bid/Build or Design-Build
- Request for Proposal (RFP)
- Coordinated Drawing & Specification Sets
- One-lines, Risers, and Details
- Cost Estimation
Bid & Construction
- Pre-Bid Meetings, and Request for Information
- Bid Review, Contractor Interviews
- Chair and Minutes of Meeting
- Site Surveys and Installation Requirements
- Contractor Interface, Direction and Negotiations
- Testing, Start-up and Commissioning Requirements
- Training and Close-out Requirements
- Substantial Completion and Invoicing
- Punch-Lists and As-Built Documentation
Security & Telecom Technologies
- IP Integrated Server Based Security Systems
- IP Video Surveillance & Intelligent Video Systems
- IP Access Control including Biometrics, Anti-passback, Anti-tailgating
- IP Video Intercom, Paging, Public Address
- Control Rooms, Control Consoles, Emergency Management
- Data Networking, Switch, Firewall, Wireless, Fiber, Cat 6
- Campus & Muli-Site Enterprise Integration and Functionality
- HMI / Touch Screen / Ergonomics / Controls
Electrical
- Power Distribution, Service Entrance, Switchgear Layout & Design
- Loading / Sizing: Panelboards, Transformers
- Infrastructure, Wiring, Conduit, WireManagement
- Lighting - Building, Site, Roadway
- Controls & Control Panels - NEMA and IEC
- NFPA 72 – NEMA Code Designs and Analysis
- Substations and Paralleling of Switchgear